A. Payment Term and Condition

Price are based on FOB Semarang Port by:

  • Telegraphic / Swift Wire Transfer (T/T)
    40% down payment in advance is required to start the production. The rest of the payment has to be done upon invoice after container loaded. original document will be sent to consignee upon receipt the transfer.
  • LC AT SIGHT

B. Order System

  • New items order will be delivered 60 days from received TT deposit receipt or opened LC
  • Repeat order will be delivered 45 days from received TT deposit receipt or opened LC

C. Packing System

  • Carton box or wrapped by single face corrugated paper